60 years of evolution, innovation and quality.
Establishment of the first Osvat facility for the production of engine valves. 500 m2 of production area.
New production headquarters covering a 1,000 m2 surface.
Implementation of new technology for Stellite coating on the valve seat.
Introduction of equipment for the production of bimetal valves.
Design and commissioning of the first automatic valve moulding station.
Opening of the new facility in Piobesi Torinese, with a 5,000 m2 production surface.
ISO 9001 and ISO 14001 certifications.
Implementation of the marking process by shifting from Electrolytic to Laser technology.
Opening of the new facility in Romania, with a 3,000 m2 production surface.
Expansion of the facility in Romania, covering a 6,000 m2 production surface.
New measurement and control systems fitted with 3D laser technology and dimensional inspection cameras.
Installation of the photovoltaic system (satellite view).
Design and commissioning of the first Robotic island for carrying out the control, marking and packaging of valves.
We are ready to face all challenges the future will throw at us...
REFERENCE
TELEPHONE
EMAIL
MESSAGE